How building envelopes give old buildings a new lease of life

1124

Simon Fielden, sales director at SFS, explains why upcycling is en vogue in construction, and how building envelopes can give old buildings a new lease of life

Recycle; refit; refurb; reuse; upcycle – often these are words seen around trendy topics like interiors, furniture and sustainability.

Indeed, this has been a growing theme globally – reducing waste, making good of what we’ve got and applying some reimagination and ingenuity.

Loop, a start-up company in the US, for example, is already working with major brands on durable, thoughtfully designed containers which can be sent back to be refilled with FMCG goods like shampoo and ice cream. With furniture, if you know your way around sanders and spray paint, you can easily turn an old 1960s chest of drawers destined for landfill into a piece fit for any five-star hotel.

The same thinking should now be applied on a larger scale to our buildings. Drive into any big city around the UK and you’ll likely be greeted with tower blocks and buildings created two, even three, generations ago, which are no longer in keeping with modern aesthetics.

Yet, demolishing is often not easy, nor the right answer; we must remember that these buildings could be people’s homes and could have protected status. This is where the building envelope can work wonders to modernise older buildings and is much easier to create than one might think.

Knowing what you want

It might sound simple but when looking at redesigning the exteriors of buildings, it really pays to know the environment and the purpose of the building.

For example, Aberdeen is known as The Granite City due to its many buildings that have been built with natural granite. It would therefore not be in keeping to design an exterior that doesn’t match and sympathise with existing buildings and the surrounding environment.

Building envelope, Sustainability, upcycling,
Crest Girls’ Academy

On the flipside, if the project is to reimagine the exterior of a primary school, then vibrant colours will lend themselves to creating a warm, inviting and fun aesthetic.

Of course, the bulk of the design work will be done by the architect. However, it is here where building envelope specialists can help realise the architect’s vision.

Rainscreen facades also come in an array of options, including zinc, stainless steel, aluminium, natural stone, high pressure laminates and fibre cement, to name a few. This variety means the architect now has a plethora of design options that can be sympathetic to the local environment or to make a bold statement.

To ensure that the envelope looks as true to the architect’s vision as possible, it is best practice to collaborate with all key stakeholders in supply, design and delivery at an early stage, which should include manufacturers of building envelope materials and fixings.

Calculated to the nth degree

While working out all the calculations and variables may sound like a daunting, time-consuming and costly task, this couldn’t be further from the truth.

Thanks to the overarching objective to move construction into the digital age, SFS has also taken the opportunity to invest into its digital technologies, and Project Builder, for NVELOPE rainscreen bracket and rail systems, is one of SFS’s key initiatives.

Project Builder can run static calculations completely free of charge and determine the specific requirements of the façades. This includes looking at the physical factors of the building, including location and height of the building as well as local wind loads.

The tool also considers the type and weight of façade that is prospectively being specified, and the bracket and component mix needed to secure the panels.

Calculations only take one working day too. Thus, specifiers can quickly and easily get an indication of horizontal and vertical centres for each bracket and the number of components required for the job.

It is critical that specifiers know what the bracket is being fixed back to whether it be to steel, concrete or timber so that the correct primary fix can be specified. For masonry concrete especially, specifiers should also ensure that the correct number of pull-out and pull-over tests have been completed.

Delivering the goods

Another area to always bear in mind is the logistics and management side of the project.

Building envelope, Sustainability, upcycling,
Forest Gate

Typically, with high-rise buildings in cities, projects are released by elevation, ie by each side of the building, north, east, south or west, or by floor level. This is done so that local disruption is minimised, and the building scheme can be completed in phases.

Logistically, though, this puts pressure on site managers with deliveries and materials, as there is often little storage space. If materials are delivered to site, they can then go missing and thus cause delays and rises in capital costs.

Here, collaboration between manufacturers and contractors is the key to success. By understanding the project programme, just-in-time deliveries can be implemented, products get to site when needed and building handover stays on time.

Technically sound 

A final consideration for specifiers and contractors is understanding the warranties and approvals for the system.

To ensure a meaningful warranty, the contractor needs to ensure that the brackets, rail and fixings are covered by a common warranty. Often this is overlooked, and brackets supplied from one manufacturer secured with fixings from another manufacturer have different warranty periods, which may not cover or deliver the required protection, thus leading to potential conflicts on site.

Always look for products that are BBA certified too. BBA certification is recognised throughout the construction industry as a symbol of quality and reassurance. Products and systems that have received this certification are tested and audited, ensuring they are fit for purpose. Products manufactured in the UK can also bring benefits from speed of technical support, deliveries and being able to deal directly with the manufacturer of the product, therefore negating the need to deal through a third party.

Not just this, but when it comes to installation, having a partner who can assist with technical queries and best practice prevents mistakes on site. This is particularly important when it comes to working with older buildings, as no two buildings will be the same.

To overcome this challenge, SFS provides on-site support where required, and, in turn, the project can be delivered much more efficiently and cost-effectively.

One person’s trash is another person’s treasure

It can be quite easy to dismiss old buildings and say that they need demolishing and rebuilding from the ground up, and that the complications are not worth the hassle. However, if the fundamental foundations are solid then buildings can easily be reinvented.

There are a host of different cladding and rainscreen options available to architects to achieve the desired aesthetic.

By working with building envelope manufacturers early in the process, issues can be foreseen, and processes can become smoother.

 

 

Simon Fielden

Sales Director

SFS Group Fastening Technology

Tel: +44 113 2085 500

uk.info@sfsintec.biz

www.sfsintec.biz

Twitter: SFSintec

 

Please note: this is a commercial profile.

Editor's Picks

LEAVE A REPLY

Please enter your comment!
Please enter your name here