Valero Energy UK Ltd and B&A Contracts Ltd have been fined after an explosion killed four workers and seriously injured another at an oil refinery in Pembrokeshire in 2011

Swansea Crown Court heard how on, 2 June 2011, the five workers were emptying a tank in the Amine Recovery Unit using a vacuum tanker when the explosion and subsequent fire took place shortly after 6pm. B & A Contracts Ltd, which was a long-term contractor at the refinery, was carrying out the work, with support from another contractor, Hertel.

Dennis Riley, 52, Robert Broome, 48, Andrew Jenkins, 33, and Julie Jones, 54, died after a storage tank exploded at the site. Andrew Philips also sustained major injuries.

The explosion resulted in a fireball which severed the 5-tonne tank roof, and this was projected 55 metres to impact against a butane storage sphere. The roof narrowly missed a pipe track where a range of flammable materials were carried.

An investigation by the Health and Safety Executive found the explosion was most likely to have been initiated by the ignition of a highly flammable atmosphere within the tank, during what should have been a routine emptying operation in preparation for further cleaning and maintenance.

The investigation also found there had been longstanding failures within the refinery safety management systems and as a result, the risks posed by flammable atmospheres within the Amine Recovery Unit were not understood or controlled.

At the time of the incident, the refinery was operated by Chevron Limited, but ownership changed in August 2011 when the sale to Valero was completed.

Valero Energy UK pleaded guilty to breaching Sections 2(1) and 3(1) of the Health and Safety at Work etc Act 1974. The company have been fined £5m and ordered to pay costs of £1m.

B & A Contracts pleaded guilty to breaching Sections 2(1) and 3(1) of the Health and Safety at Work etc Act 1974. They have been fined £120,000 and ordered to pay costs of £40,000.

HSE inspector, Andrew Knowles, said: “This incident, which had devastating consequences for all of those involved, was entirely preventable. Many opportunities to take action to control risk were missed, that would have prevented the incident from occurring. It is important to realise that the incident could have had even more serious consequences had the butane sphere or pipe track been damaged by the flying tank roof.”