Getting our BIM data in order

1282

Martyn Horne of the Landscape Institute’s BIM Working Group explains why BIM data in the form of COBie requirements is not something to fear…

To paraphrase the former Chief Construction Advisor to the UK Government, Paul Morrell, BIM is an opportunity for the construction industry to get its data in order. Of course BIM is a lot more than that, and the ability to create models of building and landscape projects in the virtual world prior to construction offers all sorts of benefits such as design analysis, clash detection, pre-visualisation and increased levels of automated design documentation.

However, in this article I want to talk about data or information — the ‘I’ in BIM. The UK Government’s BIM Mandate for Level 2 is fast approaching and the provision of data in a standard known as COBie is an important aspect of that mandate.

The UK Government BIM Level 2 Mandate and COBie

The ability to attach or embed data to virtual 2D or 3D geometry is not new. For exampIe, I have been working with Nemetschek Vectorworks since the mid 90’s, and even back then it was possible to assign data to objects in order to automatically generate schedules, reports and bills of quantities. The problem with working in any software of the time was that due to a lack of data standards, almost every project, certainly every practice, used different sets of data, which typically evolved idiosyncratically over a number of years. The difference with the BIM evolution is that collectively, as an industry, we are trying to agree common data standards throughout the lifecycle of a project chain. This involves the multiple tiers of the supply chain, the consultants, architects, landscape architects, designers, the contractors, facilities management consultants and the client.

Such a big project will take time, and for it to be successful, it will be necessary to tackle it in a number of stages. This is precisely the approach of the UK Government and the BIM Level 2 Mandate for 2016. One of the aspects of this mandate is the ability to deliver COBie compliant data. As described by Bill East of Prairie Sky Consulting; “COBie is the list of all the managed and maintained assets in a building.” He goes on to say that “the data delivered matches the information provided on the design schedules”. With my Landscape Institute hat on, I would substitute ‘building’ with project, in order to encompass wider industries such as landscape and infrastructure. Many commentators incorrectly refer to COBie primarily as a spreadsheet. It is more accurate to describe it as a data set which corresponds to a common standard, which can, if so desired, be presented in a spreadsheet format or which can also reside in a database. The important aspect is that the data corresponds to a common standard.

Why is COBie criticised?

To make my position clear, I think COBie is a good thing even if it does come in for some criticism. Often, I hear the general term that ‘It doesn’t work’. This is generally unhelpful and simply leads to increased levels of what my colleague Robert Anderson, refers to as ‘FUD’, in other words fear, uncertainty and doubt. Having said which, there are a few factors which can lead to COBie failing.

First is the misunderstanding that the full COBie dataset needs to be completed at the outset of the project. This misapprehension leads to consultants involved in the design stages to complain that their creativity is being stifled. The reality is that COBie can be completed in stages and the data is built up over time reflecting the level of resolution and detail of the design in progress. In the CIC Digital Plan of Work, there are several formal ‘data drops’ ie designated points in the design process where a data exchange takes place between the various members of the project team.

The early COBie data drops contain little more than a confirmation of the brief and schedules of the conceptual spaces, zones and areas of the building, site and landscaping. These are easily produced from today’s BIM software.

It is only during the later COBie data drops that an additional refined dataset is required. At these stages, COBIe requires a listing of the types of object used within the project, followed by individual components of the design and then the specific manufacturer and supplier.

The requirement to provide product manufacturer details leads to the second misapprehension about COBie – that of product attributes. COBie allows for product attributes to be supplied at the later stages of the project. There are two questions to consider here. Firstly, where does the designer get this information from and secondly, is it necessary to provide a complete product data specification for each object within the BIM?

To address the first question, let’s be clear, it is not the intention of COBie to place the burden of data input onto the shoulders of the architect designer. Instead, this will be fulfilled by the development and implementation of common industry standards for product specification. Initially called SPie in the US (Specifiers’ Properties information exchange) this has evolved in the UK into what we know as Product Data Templates (PDTs) and Product Data Sheets (PDSs) – simply put, these are common templates (PDTs ) supplied by the respective industry institutions (such as CIBSE, Landscape Institute ) which provide a common set of data fields. They are templates because at this stage they contain only the field names but no actual data. These templates are then filled out by each manufacturer, and supplied to the design team in the form of Product Data Sheets or preferably, digital models embedded with the same common Product Data Information.

Various organisations such as CIBSE and the Landscape Institute are working on these data templates as we speak, and we are currently in a period of consultation with manufacturing organisations and the manufacturers themselves. Another interesting development on this side is the formation of a BuildingSMART group including representatives from ARUP, Nemetschek Vectorworks, RIBA NBS, the Landscape Institute and the BRE, in addition to several international organisations who are looking specifically into how these data templates will fit into the open BIM standard of IFC.

It is fair to say this is an evolving process and with this in mind it is important that when COBie is requested at the outset of a project, the Attributes section of the COBie dataset is considered carefully at this point in time. This is where it becomes critical to have both a BIM Execution Plan (BEP) and an Employers Information Requirement (EIP) document in place at the outset of the project.

To address the second question, as to whether it is necessary to supply a complete product specification for each object within the BIM, the current consensus would suggest that it is not. Instead, we need to think about a number of aspects; what information is required to make an informed decision about which product to use in the design; what information needs to be supplied in order to construct the project; what information will be required to maintain the project and what information are the manufacturers able to provide. The Product Data Templates and Sheets project outlined above will, I believe, go a long way to answering these questions and it will be very interesting to see how this aspect of the BIM process evolves to help us collaborate together effectively and get our data in order.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Martyn Horne

Landscape Institute/ Nemetschek Vectorworks

Tel: 0207 685 2640

www.landscapeinstitute.org

www.twitter.com/talklandscape

LEAVE A REPLY

Please enter your comment!
Please enter your name here